Bates Hunter Mine Assay Results
Assays Received – 11/13/19 (2 of 2)
BH Core Samples
Following the completion of the re-logging of over 12,000 ft of BH core, additional areas of the core that were previously unsampled were split for analysis. This core is all from surface drilling and varies between 1.5 - 3 inches in diameter. Samples were taken from multiple holes and depths. Description of samples follow the data table.
Samples were sent to Hazen Research, Inc. in Golden, Colorado who performed fire assay analysis with gravimetric finish. Results presented in Table 1.0 are from Analytical Report 19M03197.
Sample Description and Depths Down Hole
BH0601-001 330.4”-330.8”: Quartz vein with black and Pyrite mineralization with some limonite. ~0.7" thick.
BH0601-002 360’-362’: Highly altered rock with disseminated Pyrite. Abundant Stringers wider than 0.4". Grey/blue quartz color.
BH0602-001 889.8”-890.5”: Quartz vein 1.0" thick, quartz has purple hinge, rich with Pyrite, chalcocite with possible galena. Minor chlorite.
BH0602-002 938’-938.9”: Pyrite vein 0.4" thick with hematite stringers. Purple hinge to the quartz.
BH0602-003 1796.4”-1796.6”: Vein is 0.3" thick with Quartz, Pyrite, Chalcopyrite and Hematite.
BH0602-004 796.1”-799”: Highly altered with abundant stringers of Pyrite, Chalcocite, Bornite, Galena and Chlorite.
BH0707-001 1943.2”-1943.6”: Pyrite and chalcopyrite vein 0.4" thick. Little to no alteration beyond vein boundary.
BH0809-001 1481’-1484’: Lightly Altered rock with abundant Pyrite stringers and magnetite crystals.
BH0810-001 1163.4”-1164.4”: Quartz with Pyrite vein spanning entire sample.
BH0810-002 1164.4”-1165.4”: Quartz with Pyrite vein spanning entire sample.
BH0810-003 1165.4”-1166.4”: Quartz with Pyrite vein spanning entire sample.
BH0810-004 1166.4”-1167.4”: Quartz with Pyrite vein spanning entire sample.
BH0810-005 1167.4”-1168’: Quartz with Pyrite spanning entire sample.
BH0810-006 1205’-1207’: Highly altered, very sericitic. Abundant Pyrite and very brittle.
BH0810-007 1207’-1209’: Very altered, sericitic, somewhat brittle.
BH0810-008 1062’-1062.8”: Quartz veins with Pyrite about 1.5" thick.
Tools used to obtain these cut samples include diamond blade saw and appropriate personal protective equipment. These samples are the twelfth set of samples taken by the current operator of the Bates-Hunter mine, BH Mining Company.
CAUTIONARY STATEMENT FOR PURPOSES OF THE SAFE HARBOR PROVISIONS OF THE PRIVATE SECURITIES LITIGATION REFORM ACT OF 1995
This quarterly report may be deemed to contain “forward-looking” statements. We desire to take advantage of the “safe harbor” provisions of the Private Securities Litigation Reform Act of 1995 and we are including this statement for the express purpose of availing ourselves of the protections of such safe harbor with respect to all of such forward-looking statements. Examples of forward-looking statements include, but are not limited to (i) projections of revenues, income or loss, earnings or loss per share, capital expenditures, growth prospects, dividends, capital structure and other financial items, (ii) statements of plans and objectives of ours or our management or Board of Directors, including the introduction of new products or services, or estimates or predictions of actions by customers, suppliers, competitors or regulating authorities, (iii) statements of future economic performance and (iv) statements of assumptions underlying other statements and statements about us or our business.
Our ability to predict projected results or to predict the effect of any legislation or other pending events on our operating results is inherently uncertain. Therefore, we wish to caution each reader of the report to carefully consider specific factors, including competition for products, services and technology; the uncertainty of developing or obtaining rights to new products, services or technologies that will be accepted by the market; the effects of government regulations and other factors discussed herein because such factors in some cases have affected; and in the future (together with other factors) could affect, our ability to achieve our projected results and may cause actual results to differ materially from those expressed herein.